Seepage analysis for a development in Jumeirah 2, Dubai
Geotechnical Investigation & Design

Seepage Analysis for a Proposed Development – Jumeirah 2, Dubai

Client

Al Nasr Contracting

Location

Jumeirah 2, Dubai

Completed

May 2025

Project Overview

Key project information

Client

Al Nasr Contracting

Location

Jumeirah 2, Dubai

Category

Geotechnical Investigation & Design

Completion Date

May 8, 2025

Project Details

Complete project information

Project overview

Al Nasr Contracting appointed Super Arc Consultant (SAC) to carry out a seepage analysis for a proposed development in Jumeirah 2, Dubai.

Scope of work

Evaluation of groundwater movement on the site.

Assessment of seepage issues that could affect the foundations and structure.

A technical report with geotechnical recommendations, construction considerations and safety checks against groundwater-induced failure.

Value delivered

The design team had groundwater risks identified and checked before excavation started.

Engineering context

Excavating below the water table drives groundwater towards the dig, and strong upward flow can cause piping or heave at the base. A seepage analysis estimates these flows and pressures so that cut-off and dewatering measures can be considered at the design stage.

Related work and reading

Related projects: Impact Analysis of Deep Foundations and Shoring for a Tower – Dubai and Shoring Design Solution for an Obstructing Manhole – Dubai.

Further reading: How excavation support and dewatering work and What a geotechnical investigation gives the designer.

Explore our Architectural Engineering Services, view all group services, or send us your project details.

Back to Project Gallery

Discover more of our exceptional projects