Predrilling and AU20 sheet pile installation at Al Jurf, Abu Dhabi
Shoring, Excavation & Earthworks

Predrilling and Sheet Piling for Excavation Support – Al Jurf, Abu Dhabi

Client

Agility

Location

Al Jurf, Abu Dhabi

Completed

Aug 2023

Project Overview

Key project information

Client

Agility

Location

Al Jurf, Abu Dhabi

Category

Shoring, Excavation & Earthworks

Completion Date

August 6, 2023

Project Details

Complete project information

Project overview

Super Arc Engineering Construction (SAEC) installed a temporary sheet pile shoring system for Agility at Al Jurf, Abu Dhabi. An 8 m sandstone layer on site made direct driving of the sheets impractical.

Scope of work

Predrilling with a bored pile rig to break through the 8 m sandstone layer and allow the sheets to be driven.

Installation of AU20 steel sheet piles.

Installation of a bracing system using HEA beams (220 to 300).

Extraction of the sheet piles after the project was completed.

Value delivered

Predrilling solved the hard-layer problem without changing the shoring design, and extracting the sheets at the end left no permanent obstruction in the ground.

Engineering context

Hard layers can stop sheet piles from reaching depth or damage them during driving. Predrilling provides a route through the layer, while the bracing supports the wall as the excavation deepens.

Related work and reading

Related projects: Predrilling and Shoring Beam Installation – Liwan and Bridge Foundation Protection Study – Dubai.

Further reading: How excavation support and dewatering work and What a geotechnical investigation gives the designer.

Explore our Shoring Systems, view all group services, or send us your project details.