Predrilling and shoring beam installation at Liwan
Shoring, Excavation & Earthworks

Predrilling and Shoring Beam Installation – Liwan

Client

Groundtech Piling & Foundation Contracting

Location

Liwan

Completed

Mar 2026

Project Overview

Key project information

Client

Groundtech Piling & Foundation Contracting

Location

Liwan

Category

Shoring, Excavation & Earthworks

Completion Date

March 9, 2026

Project Details

Complete project information

Project overview

Super Arc Engineering Construction (SAEC) predrilled and installed shoring beams for an excavation at Liwan for Groundtech Piling & Foundation Contracting.

Scope of work

Predrilling for the shoring beams.

Installation of the shoring beams.

Value delivered

Predrilling allowed the shoring beams to be set to depth so excavation could proceed safely.

Engineering context

Shoring beams must reach the required depth to support an excavation. Where the ground is too hard to drive them directly, predrilling can provide the path while limiting damage to the beams.

Related work and reading

Related projects: Assessment of an Existing Shoring System – Fashion Z1, Dubai and Shoring Design Solution for an Obstructing Manhole – Dubai.

Further reading: How excavation support and dewatering work and What a geotechnical investigation gives the designer.

Explore our Shoring Systems, view all group services, or send us your project details.