Project Overview

Key project information

Client

The First Group

Location

Dubai

Category

Shoring, Excavation & Earthworks

Completion Date

May 15, 2026

Project Details

Complete project information

Project overview

Super Arc Consultant (SAC) carried out a bridge foundation protection study beside a tower development in Dubai for The First Group.

Scope of work

Review and check of the permanent soldier pile wall design to AASHTO LRFD and Eurocode 7.

Review of monitoring reports, with statistical analysis of the readings.

Review of calibration certificates for monitoring and testing instruments.

Non-destructive testing of panels and steel, including UPV, half-cell, ultrasonic thickness and coating thickness measurements.

Site inspection and final engineering reports.

Value delivered

The study brought design checks, monitoring data and material testing together in one engineering record.

Engineering context

A retaining system used permanently must meet long-term strength, movement and durability requirements. Reading the design, monitoring trends and material tests together gives a fuller picture than any one of them alone.

Related work and reading

Related projects: Shoring Design Solution for an Obstructing Manhole – Dubai and Impact Analysis of Deep Foundations and Shoring for a Tower – Dubai.

Further reading: How excavation support and dewatering work and What a geotechnical investigation gives the designer.