Pipeline wadi crossing in Saudi Arabia
Hydrology & Flood Studies

Hydrogeological Study for a Pipeline Wadi Crossing – Saudi Arabia

Client

AMAALA

Location

Saudi Arabia

Completed

Apr 2025

Project Overview

Key project information

Client

AMAALA

Location

Saudi Arabia

Category

Hydrology & Flood Studies

Completion Date

April 3, 2025

Project Details

Complete project information

Project overview

An underground pipeline crosses an environmentally sensitive wadi in a coastal development area in Saudi Arabia. Super Arc Consultant (SAC) carried out a hydrogeological study of the crossing for AMAALA.

Scope of work

Assessment of the pipeline's effects on groundwater and surface water.

Comparison of future conditions with and without the pipeline.

Assessment of the risk of seawater intrusion.

Value delivered

The study gave the design and construction teams a basis for a crossing that meets environmental requirements.

Engineering context

A buried pipeline can change how groundwater moves, especially near a coast and in a sensitive wadi. Comparing conditions with and without the pipeline helps to show whether mitigation is needed.

Related work and reading

Related projects: Geotechnical and Hydrological Study for a School – Al Shamkha, Abu Dhabi and Flood Assessment for an Energy Facility – Abu Dhabi.

Further reading: How excavation support and dewatering work and What a geotechnical investigation gives the designer.

Explore our Hydrological Engineering Services, view all group services, or send us your project details.

Back to Project Gallery

Discover more of our exceptional projects