
Groundwater and Structural Assessment for a District Cooling Plant – Abu Dhabi
PROVIS
Abu Dhabi
Nov 2023
Project Overview
Key project information
Client
PROVIS
Location
Abu Dhabi
Category
Hydrology & Flood Studies
Completion Date
November 1, 2023
Project Details
Complete project information
Project overview
A district cooling plant in Abu Dhabi had a high water table and high salinity. Water was entering critical electrical trenches and reaching low and high voltage equipment. PROVIS commissioned Super Arc Consultant (SAC) to find the cause.
Scope of work
Geo-structural assessment of the plant.
Hydrological assessment of the groundwater conditions.
Recommendations to stop the water ingress.
Value delivered
The client received a root cause and practical recommendations for a problem that threatened the plant's operation.
Engineering context
Water in electrical trenches creates a direct risk to safety and to the plant’s operation. Assessing groundwater and structure together helps to identify the entry path and focus the repair.
Related work and reading
Related projects: Salinity Assessment of a Stormwater Network – Al Rayyan, Abu Dhabi and Flood Assessment for an Energy Facility – Abu Dhabi.
Further reading: What drives an industrial building layout and What a geotechnical investigation gives the designer.
Explore our Hydrological Engineering Services, view all group services, or send us your project details.
Back to Project Gallery
Discover more of our exceptional projects
