Complete project information
Project overview
Super Arc Engineering Construction (SAEC) installed the bored piles for a jetty at Al Mirfa for NMDC.
Scope of work
Drilling of 157 bored piles, 800 mm in diameter.
Fabrication and installation of steel reinforcement cages.
Concreting of the piles between levels -5.0 m and -13 m.
Value delivered
157 piles were completed to the specified diameter and concrete levels for the jetty structure.
Engineering context
Jetty piles work in a marine environment, carrying vertical loads and horizontal forces from berthing, mooring and waves, and concrete durability is a major concern. Concreting between specified levels also calls for careful control of volumes and cut-off levels.
Related work and reading
Related projects: Micropile Design and Installation for a Port – Al Mirfa, Abu Dhabi and Bored Piling for Rail Infrastructure – Abu Dhabi.
Further reading: How bored piles are built with temporary casing and How to choose a pile type.
Explore our Piling Services, view all group services, or send us your project details.
Back to Project Gallery
Discover more of our exceptional projects