Bored Piling for Rail Infrastructure – Abu Dhabi
Confidential client
Abu Dhabi
Jun 2026
Project Overview
Key project information
Client
Confidential client
Location
Abu Dhabi
Category
Deep Foundations, Piling & Micropiles
Completion Date
June 4, 2026
Project Details
Complete project information
Project overview
Super Arc Engineering Construction (SAEC) installed the bored pile foundations for a rail infrastructure project in Abu Dhabi.
Scope of work
Mobilisation of piling rigs.
Drilling and construction of 40 reinforced concrete bored piles, 900 mm in diameter and 22 m deep.
Static load testing.
Pile integrity testing.
Cross-hole sonic logging.
Caliper testing of the bores.
Value delivered
Each of the 40 piles was tested to railway infrastructure requirements, combining load, integrity, sonic and caliper checks.
Engineering context
Rail structures are sensitive to settlement because the track must hold its alignment. Each test answers a different question: the load test measures response, the integrity and sonic tests examine the concrete, and caliper testing checks the bore before concreting.
Related work and reading
Related projects: Bored Piling for a Jetty – Al Mirfa, Abu Dhabi and Bored Piling for Oil and Gas Facilities – Al Dhafra Region.
Further reading: How bored piles are built with temporary casing and How to choose a pile type.
Explore our Piling Services, view all group services, or send us your project details.