CFA piling for boundary walls at Yas Lean Island, Abu Dhabi
Deep Foundations, Piling & Micropiles

CFA Piling for Boundary Walls – Yas Lean Island, Abu Dhabi

Client

HILALCO

Location

Abu Dhabi

Completed

Apr 2022

Project Overview

Key project information

Client

HILALCO

Location

Abu Dhabi

Category

Deep Foundations, Piling & Micropiles

Completion Date

April 28, 2022

Project Details

Complete project information

Project overview

Super Arc Engineering Construction (SAEC) installed CFA piles to support boundary walls at Yas Lean Island, Abu Dhabi, for HILALCO.

Scope of work

Installation of continuous flight auger (CFA) piles, 500 mm in diameter, under the boundary walls.

Value delivered

The boundary walls were founded on 500 mm CFA piles, a method that installs quickly and with little vibration.

Engineering context

Boundary walls are long and lightly loaded, but weak or variable ground near the surface can cause uneven settlement and cracking. CFA piles carry the wall load to firmer ground, and their installation speed suits repeated work along a long alignment.

Related work and reading

Related projects: CFA Piling for a School – Abu Dhabi and CFA Piling and Shoring Foundations for an ENOC Station – Abu Dhabi.

Further reading: How to choose a pile type and What a geotechnical investigation gives the designer.

Explore our Piling Services, view all group services, or send us your project details.

Back to Project Gallery

Discover more of our exceptional projects