CFA Piling for Boundary Walls – Yas Lean Island, Abu Dhabi
HILALCO
Abu Dhabi
Apr 2022
Project Overview
Key project information
Client
HILALCO
Location
Abu Dhabi
Category
Deep Foundations, Piling & Micropiles
Completion Date
April 28, 2022
Project Details
Complete project information
Project overview
Super Arc Engineering Construction (SAEC) installed CFA piles to support boundary walls at Yas Lean Island, Abu Dhabi, for HILALCO.
Scope of work
Installation of continuous flight auger (CFA) piles, 500 mm in diameter, under the boundary walls.
Value delivered
The boundary walls were founded on 500 mm CFA piles, a method that installs quickly and with little vibration.
Engineering context
Boundary walls are long and lightly loaded, but weak or variable ground near the surface can cause uneven settlement and cracking. CFA piles carry the wall load to firmer ground, and their installation speed suits repeated work along a long alignment.
Related work and reading
Related projects: CFA Piling for a School – Abu Dhabi and CFA Piling and Shoring Foundations for an ENOC Station – Abu Dhabi.
Further reading: How to choose a pile type and What a geotechnical investigation gives the designer.
Explore our Piling Services, view all group services, or send us your project details.