CFA Piling and Shoring Foundations for an ENOC Station – Abu Dhabi
ENOC
Abu Dhabi
Sep 2025
Project Overview
Key project information
Client
ENOC
Location
Abu Dhabi
Category
Deep Foundations, Piling & Micropiles
Completion Date
September 17, 2025
Project Details
Complete project information
Project overview
Super Arc Engineering Construction (SAEC) carried out CFA piling and shoring foundation works for an ENOC station in Abu Dhabi.
Scope of work
Installation of continuous flight auger (CFA) piles.
Shoring foundation works.
Value delivered
SAEC completed the piling and shoring works needed for the station foundations.
Engineering context
Station sites can require foundations and excavation support to work together. CFA piles are installed without leaving an open bore, which suits sand and shallow groundwater, while shoring holds the sides of any excavation.
Related work and reading
Related projects: CFA Piling for a School – Abu Dhabi and CFA Piling for Boundary Walls – Yas Lean Island, Abu Dhabi.
Further reading: How to choose a pile type and What a geotechnical investigation gives the designer.