Project overview

Super Arc Engineering Construction (SAEC) carried out CFA piling and shoring foundation works for an ENOC station in Abu Dhabi.

Scope of work

Installation of continuous flight auger (CFA) piles.

Shoring foundation works.

Value delivered

SAEC completed the piling and shoring works needed for the station foundations.

Engineering context

Station sites can require foundations and excavation support to work together. CFA piles are installed without leaving an open bore, which suits sand and shallow groundwater, while shoring holds the sides of any excavation.

Related work and reading

Related projects: CFA Piling for a School – Abu Dhabi and CFA Piling for Boundary Walls – Yas Lean Island, Abu Dhabi.

Further reading: How to choose a pile type and What a geotechnical investigation gives the designer.