
Bored Piling for Lighting Poles – Saadiyat Island, Abu Dhabi
HILALCO
Saadiyat Island, Abu Dhabi
Jan 2025
Project Overview
Key project information
Client
HILALCO
Location
Saadiyat Island, Abu Dhabi
Category
Deep Foundations, Piling & Micropiles
Completion Date
January 11, 2025
Project Details
Complete project information
Project overview
Super Arc Engineering Construction (SAEC) installed cast-in-situ bored piles for lighting pole foundations on Saadiyat Island for HILALCO.
Scope of work
Drilling of the pile bores.
Casing of the bores.
Installation of reinforcement cages.
Concreting of the piles.
Value delivered
Each lighting pole was set on a cast-in-situ pile built through the full sequence of drilling, casing, reinforcement and concreting.
Engineering context
Lighting poles are light, but wind acting on their height creates an overturning moment at the base. A cast-in-situ pile gives a compact foundation that resists this moment, while casing helps keep the bore stable in loose ground near the surface.
Related work and reading
Related projects: Bored Piling for Mid-Island Parkway Poles – Saadiyat Island, Abu Dhabi and Piling for Traffic Sign Foundations – Dubai.
Further reading: How bored piles are built with temporary casing and How to choose a pile type.
Explore our Piling Services, view all group services, or send us your project details.
Back to Project Gallery
Discover more of our exceptional projects
