Bored piling for high-voltage transmission line foundations, Al Dhafra Region
Deep Foundations, Piling & Micropiles

Bored Piling for High-Voltage Transmission Lines – Al Dhafra Region

Client

Confidential client

Location

Al Dhafra Region, Abu Dhabi

Completed

Apr 2025

Project Overview

Key project information

Client

Confidential client

Location

Al Dhafra Region, Abu Dhabi

Category

Deep Foundations, Piling & Micropiles

Completion Date

April 2, 2025

Project Details

Complete project information

Project overview

Super Arc Engineering Construction (SAEC) installed bored piles for high-voltage transmission line foundations in the Al Dhafra Region.

Scope of work

Drilling of bored piles in several diameters and depths.

Fabrication and installation of steel reinforcement for the pile foundations.

Value delivered

The transmission line towers were given pile foundations sized to the loads and ground at each location.

Engineering context

Transmission towers are tall, relatively light structures, so wind can produce uplift and overturning forces in their foundations as well as compression. Bored piles can resist these combined loads, and their diameter and depth can be varied to suit each tower location.

Related work and reading

Related projects: Bored Piling for Oil and Gas Facilities – Al Dhafra Region and Foundation Design and Construction for Telecom Towers – Abu Dhabi and Al Dhafra.

Further reading: How bored piles are built with temporary casing and How to choose a pile type.

Explore our Piling Services, view all group services, or send us your project details.