Ruwais - LNG Transmission Pipeline
ADNOC
ABU DHABI
Jun 2025
Project Overview
Key project information
Client
ADNOC
Location
ABU DHABI
Category
Hydrulic & Hydrology Assessment
Completion Date
June 16, 2025
Project Details
Complete project information
The project involved a hydrological and hydraulic flood assessment for the BVS-05 station, part of ADNOC GAS’s pipeline network supplying preconditioned gas from Habshan 5 to Ruwais LNG plant. The station is located in the Al Ruwais area, approximately 3.6 km from the Gulf.
The study evaluated catchment characteristics, rainfall-runoff behavior, and flood risks affecting the station. Advanced hydrological and 2D hydraulic modeling were carried out to determine maximum flood levels,
The results were used to define safe final grading levels and flood protection requirements for the station.